20% OFF shipping at www.midwoodautocraft.com on orders over $79 + up to 10% OFF products
www.midwoodautocraft.com
home > Building America's Hangar: The Design and Construction of the Steven F. Udvar-Hazy Center > Building America's Hangar: The Design and Construction of the Steven F. Udvar-Hazy Center
download picture
Building America's Hangar: The Design and Construction of the Steven F. Udvar-Hazy CenterThe Steven F. Udvar Hazy Center building at Washingtons Dulles International Airport, the first phase of which opened in December 2003, represents the fulfillment of the Smithsonian Institutions long held ambition to build a specialist facility to house the National Air & Space Museums ever growing collection of commercial aviation and space artifacts. As early as the mid 1960s proponents of the NASM were suggesting that the newly built Washington
Shopping security

Shopping security

Each payment you make on thelockerguy is secured with strict SSL encryption and PCI DSS data protection protocols

The Steven F. Udvar-Hazy Center building at Washington’s Dulles International Airport, the first phase of which opened in December 2003, represents the fulfillment of the Smithsonian Institution’s long-held ambition to build a specialist facility to house the National Air & Space Museum’s ever-growing collection of commercial aviation and space artifacts.

As early as the mid-1960s proponents of the NASM were suggesting that the newly built Washington Dulles Airport could meet the needs of the Smithsonian as the ideal location for the display and conservation of its huge aircraft collections held at its store in Suitland Maryland. In the end the Downtown site on the National Mall won the day, and in July 1976 one of the most popular museums in the world opened it doors, leaving many aircraft behind at a 21-acre Maryland site.

This copiously illustrated volume tells the story of the building of the new Hazy Center building. Beginning with the project’s earliest conception and planning in 1993, when the US Congress approved $8 million for the design the “Dulles Extension”, Lin Ezell – celebrated author of Out of Harm’s Way, Moving America’s Lighthouse (2001) – unfolds the story of the clearance of the site and the construction of the building designed by architects Hellmuth, Obata + Kassabaum. HOK remained true to the original concept a building that would meet the special needs of a large collection of air-and space craft, along with millions of visitors, but still fit the ambience of an airport. HOK’s solution was a dramatic yet incredibly elegant building, featuring a massive vaulted space, reminiscent of the old zeppelin hangars, to house 200 aircraft – a second “hangar” to house 135 space vehicles, together with specialist restoration facilities, research archives, an education center and Imax movie theatre – some 760,000 square feet in all.

Employing a lively and accessible mix of running text, special-feature sidebars and stunning large-format ground, installation and aerial photographs, as well as plans, photomontages, and detailed “action” shots, the author brings to life the details of engineering and construction processes– such as the raising of the massive main hangar roof – and explores the challenges and demands faced by the project team, of which she was a key member., ISBN13:9781904832072 ISBN10:1904832075 Material Type:hardcover

Building America's Hangar: The Design and Construction of the Steven F. Udvar-Hazy Center

Item no : 40750870749
sold recently : Login >>
US$ 30.75
Pay in 4 interest-free payments of $7.69 Learn more
Min. order: 1piece

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 15 - Aug 20

Enjoy 20% off shipping

US$ 30.75

1-11

US$ 27.68

12-35

US$ 21.52

36-59

US$ 18.45

60+

US$40

Get now

Sign up to your membership to get coupons up to

15%

Get now

Opportunity to enjoy order discount up to 15% off

Please add the products
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

recommand products

EIRA
EIRA

US$ 69.00

Min. order: 1 piece

4.3 (64 reviews)

Sold : Login>>

ESTELLE
ESTELLE

US$ 71.00

Min. order: 1 piece

5.0 (55 reviews)

Sold : Login>>

Related Searches